Top Menu

I am wondering how long a PR card takes once it has gone into production? My card went into production on 1 march and I need to fly to the US on 23 March, would this be a long enough time frame?

You should have received it. Call IRCC at 1-888-242-2100 to find out what is happening.

Comments are closed.

Powered by WordPress. Designed by Woo Themes